PHASE II - Benchmarking participants’ manufacturing facilities

a) Expected results


A short survey report will be furnished via a pre-designed questionnaire for each participating company. This report will estimate the potential productivity improvements that might be expected following the participants’ completion of the workshops and in-house coaching sessions. Where appropriate an outline action plan for improvement may be prepared.

b) Activities

A questionnaire will be designed to review the companies who are participating in the project. The questionnaire will provide advance data before a site visit. The concept will be to benchmark each company against a set of established criteria relevant to apparel manufacturing. The driving force of productivity improvement will come mainly from increasing direct labour efficiency. As such, the benchmarks that will be measured will the following.

• Production output
• Operating efficiency of the direct labour force
• Number of direct to indirect employees
• Added value per standard hour produced
• Cost per standard hour charged
• Cost per standard hour produced
• Standard minutes per garment
• Raw material utilization
• Defect rate per hundred units produced
• Throughput time
• Lead time
• Style mix and variety
• Average order size
• On time delivery performance
• Style changeover time

All the above benchmarks will be measured objectively using company data. In addition, there will be some subjective measures also considered during the benchmarking exercise. These will include the following:

• Level of technology being used
• Current methods employed
• Use of management information systems
• Product development capability
• Level of housekeeping
• Capability of management
• Management techniques being used (i.e. work study, Garment technology)

These key performance indicators will then assist in the tuning of the workshops. Best practice will be discussed with the participating companies and a gap analysis will be produced that will allow the project team to focus on areas of improvement.

The Project Team, along with the international experts intends devoting two days per company to visit their factories for this task.

Benchmarking of participants’ manufacturing facilities  
(26/11/2006)

Benchmarking of participants’ manufacturing facilities is currently in progress. In this phase of the project, the consultants are assessing current operating systems and methods of companies against best practice.

 

FACTORY

LOCATION

DATE OF VISIT

1

Marie De Classique

Homagama

01/11/05

2

Orit Apparels Lanka Pvt Ltd (Wrack Apparels)

Marawila

02/11/05

3

Hirdaramani Industries - Kuruwita

Kuruwita

03/11/05

4

Jacqualine Clothing Pvt Ltd

Boralesgamuwa

04/11/05

5

Rusirumal Pvt Ltd

Seethawaka

07/11/05

6

Denshun Industries Pvt Ltd

Kaduwela

08/11/05

7

Texwood Industries Ltd

Katunayake

09/11/05

8

Golden Needle Apparels Pvt Ltd

Piliyandala

10/11/05

9

Nilano Garments Pvt Ltd

Ratmalana

10/11/05

10

MRC Associates Garments Pvt Ltd

Moratuwa

10/11/05

11

Christy Lanka Apparels Pvt Ltd

Colombo 14

11/11/05

12

Raiwin Garments Pvt Ltd

Wattala

11/11/05

13

Jinadasa Brothers (Garments) Ltd

Boralesgamuwa

14/11/05

14

Kane Apparels Pvt Ltd

Pitakotte

14/11/05

15

Nasna Impex Garment Ind. Pvt Ltd

Homagama

14/11/05

16

Superior Knitwear Co. Ltd

Panadura

21/11/05

17

Tulip Apparels Pvt Ltd

Horana

21/11/05

18

North Western Apparel Pvt Ltd

Wariyapola

22/11/05

19

Mirigama Clothing Pvt Ltd

Loluwagoda

22/11/05

20

Jaqalanka Apparels Pvt Ltd

Balangoda

23/11/05

21

Kundanmal Apparel Pvt Ltd

Mount Lavinia

23/11/05

22

Yellowline Pvt Ltd

Arangala, Naula

23/11/05

23

Super Fine International Garments Pvt Ltd

Katuwana

24/11/05

24

Polytex Garments Ltd

Yakkala

24/11/05

25

Miami Exports Pvt Ltd

Homagama

25/11/05

26

Tarakie Garments Pvt Ltd

Kosgoda

25/11/05

27

Bernard Botejue Industries Ltd

Hambantota

25/11/05

28

Continental Fashions Pvt Ltd

Wattala.

28/11/05

29

Readywear Industries Limited

Elpitiya

28/11/05

30

M Samson Silva & Co. Pvt Ltd

Piliyandala

29/11/05


 